24 Feb Saggas, increases its production by 32% in 2021
In total, the plant has handled 1.88 million tons of LNG. Saggas regasified 12.6% of the LNG introduced into the Spanish gas system. The Sagunto regasification plant has increased its production by 32% in 2021, with a total of 27,247 GWh compared to the 20,659 GWh produced...